Production improvements

of Reclaimers and Loadout Station

indurad successfully delivered a customised turnkey project consisting of a Reclaimer & Loadout facility where the complete scoping, design, installation, control system integration, training and performance acceptance formed part of the scope. INDURAD delivered on the following requirements from the client:

  • reduction of over torque events (-75%)
  • increase of high torque reclaiming (+4,3%)
  • elimination of air-digging
  • reduction of attack-times

Language selector

We use Google Language Translator Plugin that uses the free Google automatic machine translation.

Be aware that not all translations have to be correct and that your IP address will be transmitted to Google to receive the translations.

You can always return to our original English version. 

english

español

français

português

русский