Performance Improvements Iron Ore Loadout

In this project for a major Australian iron ore mine in the Pilbara region, Indurad implemented a reclaimer and loadout solution as a turnkey supplier.

The main objectives were to improve the reclaim rates in order to more consistently deliver the right quality material to the loadout:

  • 4.3% improved net reclaim rate
  • 75% reduction in bucket wheel overtorque

This results in a more consistent production and quality mix to the loadout. The loadout itself was equipped with several iLoadout and iBelt modules for archiving:

  • Train loading accuracy, allowing higher car set points without overloading
  • 30% more train speed (from 0.9km/h to 1.2km/h)
  • >1 ton less standard deviation (from 3.7t to 2.3t)

indurad was able to deliver the project at warp speed. It took 5 months and 2 days from order to acceptance.

Language selector

We use Google Language Translator Plugin that uses the free Google automatic machine translation.

Be aware that not all translations have to be correct and that your IP address will be transmitted to Google to receive the translations.

You can always return to our original English version. 

english

español

français

português

русский